- R649-3-6 - 1. Change of Drilling Plans
2.1 Reporting the Spudding In of a Well
(Report of both
dry hole and rotary spud is required)
2.2 Entity Form Requirements
2.3 BOP Tests 2.4
Monthly Drilling Status Report 2.5
Casing Tests 2.6 Reporting Fresh Water
Encountered